Data centers
Kouvola Savontalo DC site
Zoning readiness
Zoning ready for data center useNotes on investment regulatory readiness
Zoning ready and building rights defined. Building permit to be applied. The owner and permission authorizer (city of Kouvola) aware of the data center plans on site.Building right / [m2]
41 400Building right can be extended up to / [m2]
80 000Site area / [m2]
103 500Site area can be extended up to / [m2]
201 000Notes on site size and building permit
Possibility to negotiate on larger building right. Now e=0,4.
Design rules and regulations
possibility to build 2 floor building
Notes on site topography
Site contour elevation drops slightly towards south.
Prevailing wind directions
Prevailing wind directions south-west.
Natural water source available for cooling
AvailableIf yes, distance to water source / [meters]
200Notes on cooling options
Various cooling options. River Kymijoki next to the site. Air cooling also possible.
Type of ground
Clay. Current use agriculture. Constructability study made.
Levelling of plot
Plot is not construction ready / levelledNatural risks
No natural hazard risks.
Proximity of major roads, airports, flight paths and railways
Major road VT6 next to site, also railway, no junction.
Proximity of hazardous industries
Kemira ca. 2km
UPM ca. 2 km
Proximity of near by communities
No traffic jams nearby. Nearest residential area 0,5 km.
Current access to the site
One roadNotes on current and planned access to the site
Access to the site from two directions.
Emergency vehicle accessibility
accessible
Distance to nearest international airport / [km]
135Distance to nearest fire & rescue station / [km]
1Distance to nearest police station / [km]
1Distance to nearest hospital or health care center / [km]
5Availability of public transportation
Public transportation available.
What is needed to realize total power supply?
Infrastructure upgrade needed:
Two new 110 kV cables (2,5km)
Two new 110 kV GIS cubicles at Kuusankoski Hydro Power Plant
Fingrids 110 switchgear and two new 110 kV/20 kV transformers at DC site
Lead time for total power supply to the site / [months]
30Redundancy power availability
Available (less than total main power feed)Distance to 10 kv power connection point / [km]
0.1Distance to 20 kv power connection point / [km]
0.1Distance to 110 kv power connection point / [km]
0.1Distance to local grid substation, 110 kv / [km]
0.1Distance to national grid substation, 400 kv / 110 kv / [km]
0.1First phase electricity power supply (in 18 months or sooner)
11-20 MWFirst phase power supply to the site
0 - 18 monthsFirst phase electrical feed to the site
110 kVFirst phase redundancy power availability
Available (less than first phase main power feed)Notes on power supply
Redundant 10MW available on site
Local green energy
AvailableDetails on local green energy (suppliers)
3 hydro power stations in a circle, total 75MW. Supplier UPM Energy.
Local electricity supplier(s)
KSS Energia Oy
Distance to optical fiber infrastructure / [km]
0.1Distance to optical fiber infrastructure / [miles]
0.062137Amount of diverse connections
2Connectivity supplier(s) to provide diverse connectivity
Telia Finland Oyj [1475607-9]
Elisa Oyj
Dark fiber on the site
AvailableDistances to local internet exchange points (ix) in Finland
FICIX1 135km, FICIX2, 140 kmDescribe different cable routes from the site to key directions in and from Finland
5 different routes available
Route 1:
Kouvola DC – Lahti – Mäntsälä - Helsinki
Location next to rail road
190 km
Route 2:
Kouvola DC – Lahti – Mäntsälä - Helsinki
Location VT12 and VT 140
165 km
Route 3:
- Kouvola DC – Elimäki – Porvoo - Helsinki
- Location VT6 and VT170
- 140 km
Route 4:
- Kouvola DC – Kotka – Helsinki
- Location Sea cable
- 201 km
Route 5:
- Kouvola DC – Lahti – Riihimäki – Kerava – Helsinki
- Location next to rail road
- 205 km
Notes on fiber connectivity
Providers who can provide connectivity:
Cinia, TeliaSonera, Elisa and DNA
- dark fiber, Wavelength, L3-VPN, Ethernet and IP-Transit services via many different fiber route
FNE
- dark fiber and Ethernet services with several fiber route
Teknomeria
- dark fiber
Water utilities on site
Potable water supply availableDistrict heating network
AvailableDistance to district heating network / [km]
1Natural gas availability on site
Natural gas availableDistance to natural gas network / [km]
0.1Opportunities to utilize waste heat
to be discussed with KSS Energy
Distance to delivery point / [km]
1Investment incentives
to be discussed with Kouvola Innovation
Other cost benefits
to be discussed with Kouvola Innovation
Notes on local ecosystem
CTS Engineering (www.ctse.fi), experience on planning large DCs
Due to the regions long history in paper production, local companies have plenty of experience on constructing and maintaining process facilities.
Availability of skilled laborforce
Skilled laborforce available for facility management, construction and DC operations.
Higher education resources
Nearest higher education unit in Kouvola, LUT department.
Person(s) responsible for provided information
Kati Landen (Business Advisor)
kati.landen@kinno.fi
+358 20 6156363