Data centers Cool Scandinavia Business Park for Data Centers, Mäntsälä - Kapuli

Data centers

Cool Scandinavia Business Park for Data Centers, Mäntsälä - Kapuli

Kapuli Business Park is just a stone’s throw away from the Mäntsälä center, and only 45 minutes from Helsinki-Vantaa International Airport by road. Our energy company, Nivos Oy, helps you with the energy and broadband related matters. Cool climate and reusable excess heat helps in keeping the data center costs down. Excess heat from cooling is transmitted for heating houses in Mäntsälä.

Address: Moreenikatu, 04600 Mäntsälä, Finland
Coordinates: 60.6292833, 25.26831166
Owned by: Business Development Company Mäntsälä
Type: Greenfield

Zoning readiness

Zoning ready for data center use

Building right / [m2]

200 000

Building right can be extended up to / [m2]

200 000

Site area / [m2]

300 000

Site area can be extended up to / [m2]

300 000

Notes on site size and building permit

Site area is 3 - 30 hectares, the buildable area is 2 – 20 hectares.

Shape and topography:

  • Kapuli IIc: already leveled and ready to build. Soil condition: broken rocks.

  • Kapuli III: will be leveled beforehand. Soil condition: broken rocks, moraine.

Municipality of Mäntsälä owns approximately 100 hectares of land at the Kapuli Industrial Area.

Approximately 38 hectares of the area has been zoned so far. The rest of the area will also be zoned as an industrial and logistics area in the next few years.

In addition, there are plans for a road connecting Sälinkääntie road to Kehä V; this connection will go across the area.

The lot to be sold (unseparated parcels of land) are owned by the municipality, and the construction of buildings for industrial and logistics purposes is allowed under the current city plan, as is the case already with the headquarters and logistics center of Tokmanni retail store chain (71 700 square meters) and a private investor's hall (4000 square meters).

In practice, a water pipe and a sewer have already been constructed reaching the border of the lot, and there is also a natural gas pipeline nearby.

Moreover, district heating is available from the neighbors.

At its natural state, the lot was forested land with bedrock outcrops, the soil was leveled in 2008-2009 to the present height using soil excavated from the area.

You can see available plots in our website by clicking this link

Design rules and regulations

Permits: Ordinary building permits, other permits depend on the activities and are regulated by mostly environmental laws.


Download (pdf) The building permit process and planning work in Mäntsälä


Pre-approval of construction and environment permits, fire and rescue plan

Plans pre-approved by all authorities

Notes on site topography

Site is flat and ready to build.

Natural water source available for cooling

Not available

Notes on cooling options

  • Fresh water and sewerage on the site
  • Natural gas option on the site
  • District cooling, customized district cooling to the district heating on the site.
  • Excess heat from cooling is transmitted for heating houses in Mäntsälä.
  • Cool climate, average temperature is 4.6 °C, 17 days over 25 °C

Type of ground

Broken rocks. No bore holes.

Levelling of plot

Plot is construction ready / levelled

Type of forestry (if plot not levelled)

No forest. Plot is levelled.

Layout plan of datacenter building(s)

Detailed plan exists

Existing buildings

Tokmanni logistic center; Yandex data center; An office buiding.

Existing power systems

Kapuli Business Park enjoys electric power supplies of first-rate dependability, with sufficient capacity ensured through the connection of Mäntsälän Sähkö Oy (local energy company) at two key points in the Finnish national grid. This means that the Business Park can draw a guaranteed 1-50 MW of electrical power from three electricity stations through either of two power lines. In Finland, you can seek best bids for the electricity.

The 110kV Regional Grid

Mäntsälän Sähkö has begun designing a new, third 110 kV power transmission line directly from the Hikiä generating plant to the substation at Kapuli Business Park. The new line will further improve the dependability of electric power supplies to data centers in the Kapuli area. It is estimated that the new transmission line will be completed in 2017, whereupon Kapuli will be served by three independent 110 kV power cables from two (three) separate connection points on the national grid. The construction work will also duplicate the outgoing transmission line connection at Hikiä to supply two separate substations. Each of the three 110 kV transmission lines will be capable of supplying about 150 MW of electric power to Mäntsälä.

There will be no minimum connection limit for the Mäntsälän Sähkö 110 kV regional network, so a new operating point beginning at low peak power may be connected to the regional network by bilateral agreement. This will give you flexibility in timing investments, and the freedom to develop your operations without the constraints of a connection limit.

Notes on existing infrastructure

Infrastructure is available on site.

Natural risks

No natural risks

  • No floods area
  • No hurricanes, tornados
  • No volcanos
  • No earthquakes

No hazards from neighboring activities

  • Data center (Yandex)
  • Warehouses (Tokmanni)

Proximity of major roads, airports, flight paths and railways

  • Nearest highway: E4, distance 1 km
  • Nearest community center: Mäntsälä municipality, distance 4 km
  • Major international airport: Helsinki-Vantaa, distance 52 km
  • Train connections: distance to the station 0.9 km

Proximity of hazardous industries

No hazardous industries nearby.

Proximity of near by communities

1km to city center.

Current access to the site

One road

Emergency vehicle accessibility

Direct access from existing roads.

Distance to nearest international airport / [km]

60

Distance to nearest fire & rescue station / [km]

4

Distance to nearest police station / [km]

4

Distance to nearest hospital or health care center / [km]

4

Availability of public transportation

Connection to nearby cities throgh train and bus-station, located within a few kilometers from the site.


What is needed to realize total power supply?

300 MW Power supply is available on site.

Lead time for total power supply to the site / [months]

1

Redundancy power availability

Available (same as total main power feed)

Arrangement of redundancy power

By offer

Distance to 10 kv power connection point / [km]

0.01

Distance to 20 kv power connection point / [km]

0.01

Distance to 110 kv power connection point / [km]

0.01

Distance to redundancy power connection point / [km]

0.01

Distance to local grid substation, 110 kv / [km]

0.01

Distance to national grid substation, 400 kv / 110 kv / [km]

0.01

First phase electricity power supply (in 18 months or sooner)

11-20 MW

First phase power supply to the site

0 - 18 months

First phase electrical feed to the site

110 kV

First phase redundancy power availability

Available (same as first phase main power feed)

Notes on power supply

  • Kapuli Business Park enjoys electric power supplies of first-rate dependability, with sufficient capacity ensured through the connection of Mäntsälän Sähkö Oy (local energy company) at two key points in the Finnish national grid. This means that the Business Park can draw a guaranteed 1-50 MW of electrical power from three electricity stations through either of two power lines. In Finland, you can seek best bids for the electricity.


  • The 110kV Regional Grid. Mäntsälän Sähkö has begun designing a new, third 110 kV power transmission line directly from the Hikiä generating plant to the substation at Kapuli Business Park. The new line will further improve the dependability of electric power supplies to data centers in the Kapuli area. It is estimated that the new transmission line will be completed in 2017, whereupon Kapuli will be served by three independent 110 kV power cables from two (three) separate connection points on the national grid. The construction work will also duplicate the outgoing transmission line connection at Hikiä to supply two separate substations. Each of the three 110 kV transmission lines will be capable of supplying about 150 MW of electric power to Mäntsälä.


  • There will be no minimum connection limit for the Mäntsälän Sähkö 110 kV regional network, so a new operating point beginning at low peak power may be connected to the regional network by bilateral agreement. This will give you flexibility in timing investments, and the freedom to develop your operations without the constraints of a connection limit.

Local green energy

Available

Details on local green energy (suppliers)

The local power company, Nivos, is a shareholder in a company called Suomen Voima that seeks to source electricity generating capacity, thereby enabling participation in larger projects. Nivos can use this stake to study the prospects for participating in the procurement of generating shares in new Finnish power plants. We are also interested in studying the feasibility of working with you to build a competitive biofuel-fired CHP generating plant.

We now have the technology to fit solar panels on the roof of a building and generate about 1 MW of power. This energy is not subject to excise tax when the energy is used in-house.

Local electricity supplier(s)

Nivos Oy

Distance to optical fiber infrastructure / [km]

0.01

Distance to optical fiber infrastructure / [miles]

0.0062137

Amount of diverse connections

3 or more

Connectivity supplier(s) to provide diverse connectivity

Elisa Oyj

DNA Oyj

Arrangement of connection diversity

By offer.

Dark fiber on the site

Available

Distances to local internet exchange points (ix) in Finland

Helsinki 45 km

Describe different cable routes from the site to key directions in and from Finland

  • 10,000 km fiber routes
  • NGN DWDM, SDH, Ethernet
  • IP core network MPLS
  • Dedicated IP networks
  • Several co-locations
  • Gateway locations to Russia
  • Telematic systems

Notes on fiber connectivity

Kapuli Business Park enjoys fast, high capacity, assured data connections to the main Finnish Internet hub (FICIX).

There are several operators using fibre optic connections in Mäntsälä:

  • Cinia Oy
  • FNE-Finland Oy
  • Elisa Oyj
  • DNA Oy
  • TeliaSonera Finland Oyj
  • They all have fiber optic network in Mäntsälä and enough network capacity is available or can be built according to an order.

Commitment of local utility companies

Ongoing planning and investment readiness exists

Water utilities on site

Waste water sewage available

Notes on water utilities

  • Fresh water and sewerage on the site
  • Supplier: Water company "Mäntsälän vesi", owned by Municipality of Mäntsälä

District heating network

Available

Distance to district heating network / [km]

1

Notes on district heating network

  • Customized district cooling to the district heating on the site.

Natural gas availability on site

Natural gas available

Distance to natural gas network / [km]

1

Notes on (liquid) natural gas

Available on site

Opportunities to utilize waste heat

  • Any excess heat from operations such as cooling may be transmitted for further use. Our proposal for your cooling solution is customized district-cooling. This would lower your investment cost as well as cost of energy.
  • If you choose Mäntsälä to be the site for your data center we can build a facility that would produce both heat and cooling using heat pump technology.

Distance to delivery point / [km]

1

Other cost benefits

Our Strengths

  • Educated labor force available.
  • Excellent commuting options
    A single owner for energy, water and site (Municipality of Mäntsälä),
  • Experience what datacenter needs (Yandex 2013).
  • Locations near capital city Helsinki and airport.
  • With a population of over 20,000, Mäntsälä is a thriving municipality in the Helsinki Metropolitan Area.
  • Mäntsälä is located at the junction of highway no. 4 and the Kehä V Helsinki ring road. In other words, it is the crossroads of the road from Hanko to Porvoo, just a VT40-kilometer drive from the Finnish capital.
  • Mäntsälä is only 40 minutes from Helsinki by Z-train and 20 minutes from Lahti.
  • The population is young, and many families with young children have made their home here. A wide range of services and leisure activities, beautiful countryside and excellent transport links attract new residents. What more could you ask?
  • The search engine company Yandex selected Mäntsälä most of all for its excellent benefits in terms of location, secure energy supply and overall energy economy.
  • We have established contacts with construction companies, employment services, security companies etc.

Data Sovereignty in Finland

States that have adopted strict legislation on data protection generally tend to be more favorable to the placement of datacenters than states without or lacking sufficient legal framework of data sovereignty.

The legislative environment of Finland is quite different even from the other Nordic countries. In Finland the right of privacy of any communication is a basic right that is inviolable and there is a strong legal protection over governmental surveillance of digital information.

The favorable legislation to store and handle information has led many data center operators to establish business in Finland. The Government of Finland still intends to hold on firmly to this leading position in the world of digitalization and framework necessary for growth of this digital industry will be sustained also in the future.

Employment in Finland

Accident and Pension Insurance

The employer has a statutory obligation to take out accident and pension insurance for the employees; the employees are also provided with group life assurance and unemployment insurance in connection with the statutory accident insurance. The employer must arrange for statutory occupational health care.

Tax and Social Security

The employer is responsible for paying any withheld taxes and social security contributions to the tax authorities, and for submitting annual notifications to the tax authorities, and the pension and accident insurance companies, with information on the wages and salaries paid to employees.

Terms and Conditions of Employment

Working hours

Regular working hours are usually at most 8 daily hours and 40 weekly hours. In a two week period the working hours are not more than 80 hours and in a three week period 120 hours. The weekly hours may also be arranged in longer periods during which the average weekly hours do not exceed 40 hours. Working hours may be arranged by law or collective agreements alternatively, for example in two or three week periods.

Holidays

An employee has a right to receive pay also for the time he/she is on annual holiday. Normally holiday leave accumulates 2 days (when employment has lasted less than 1 year) or 2 1/2 days for each holiday credit month. Normal wages are paid for the time an employee is on holiday.

Sick pay

According to the law, an employee who is unable to work due to an illness or an accident is entitled to paid sick leave. Wages are paid for the day when the illness started and for the working days. If the employment relationship at the start of the disability has lasted for at least one month, the employee will be paid full wages for the said period. If the employment relationship has lasted for a period shorter than one month, half of the wages will be paid for the same period.

Parental leave

Parental leave lasts 158 working days taken during pregnancy or in the period following birth. It is extended by 60 working days per child in the case of multiple births. During the parental leave, Kela (The Social Insurance Institution of Finland) pays parental allowance. Both parents can take the parental leave in up to two separate periods of at least 12 working days each.

Our Services at the Business Development Company Mäntsälä

  • Help businesses relocate to Mäntsälä
  • Sell commercial plots at attractive rates
  • Keep an up-to-date register of vacant private commercial and production premises and services
  • Help businesses looking for premises.
  • We also provide advice on starting, relocating or developing commercial operations
  • Our Tips and expert advice make it easier to run a business in Mäntsälä.
  • We co-operate closely with ABB and Schneider Electrics. We also have good relations with different building companies in Finland. We can help you with recruiting and the permission questions.

Members of the local datacenter campus

Nivos Oy

Invest in Finland / Finpro

Calefa Oy

ABB Finland

Global DC Oy

Keuda

Laurea University of Applied Sciences

Municipality of Mäntsälä

Availability of skilled laborforce

  • Educated labor force available.
  • Excellent commuting options
  • Mäntsälä is only 40 minutes from Helsinki by Z-train and 20 minutes from Lahti.
  • With a population of over 20,000, Mäntsälä is a thriving municipality in the Helsinki Metropolitan Area.
  • The population is young, and many families with young children have made their home here. A wide range of services and leisure activities, beautiful countryside and excellent transport links attract new residents.

Person(s) responsible for provided information

Juha Leinonen (CEO)

juha.leinonen@yrityskehitys.net

Availability

For sale

Site address

Moreenikatu, 04600 Mäntsälä, Finland