Data centers Moreeni Hämeenlinna

Data centers

Moreeni Hämeenlinna

Large shovel-ready site with fluent communications

Rectangular hard moraine site with great utility conditions and great location on business area near Hämeenlina city and airport in safe environment



Address: Karanojantie, 13430 Hämeenlinna, Finland
Coordinates: 60.9451142, 24.4856292
Owned by: City of Hämeenlinna
Type: Greenfield
WWW:

Zoning readiness

Zoning ready for data center use

Building right / [m2]

175 000

Building right can be extended up to / [m2]

525 000

Site area / [m2]

250 000

Site area can be extended up to / [m2]

750 000

Easements

No easements

Notes on site size and building permit

The building control department of the City of Hämeenlinna will process the planning permission as an officer decision in approx. 4 weeks from the arrival of the application. The appeal period is 14 days.

The excavation work may be started before the permission is final.

Before applying the planning permission, change work may be carried out on the plot with a landscaping permission.

Pre-approval of construction and environment permits, fire and rescue plan

Plans pre-approved by all authorities

Prevailing wind directions

Prevailing wind direction is south-western. Typical wind velocity is 5-6 m/s.

Natural water source available for cooling

Not available

Notes on cooling options

If cooled with tap water, needs own water tank. Possible waste water equalisation tank, if not possible discharge to terrain because of quality.

Type of ground

Mainly moraine, geotechnical conditions and constructability are on an excellent level

Levelling of plot

Plot is construction ready / levelled

Layout plan of datacenter building(s)

Detailed plan exists

Existing buildings

No existing buildings

Existing power systems

20 kV line is next to the site

Natural risks

  • No destroying storms or winds
  • Only minor earthquakes have been registered in the area of Hämeenlinna during 2000 - 2015. The latest registered earthquake in Hämeenlinna was in 19.10.2008, magnitude 1.0. (University of Helsinki, Department of Geosciences and Geography).
  • No nuclear power stations
  • No hazardous industries around
  • No explosive/dangerous operations
  • No airports nearby
  • No landslides/overflows (No mountains/seas)

Due to the difference between the levels of the site and Vanajavesi lake surface, there are no risks of flooding. (See image below presenting Flood risk areas in Hämeenlinna).

Proximity of major roads, airports, flight paths and railways

Airports: Helsinki Vantaa 100 km, Tampere 75 km

Railway , Hämeenlinna 10 km

Motorway -500 m

Proximity of hazardous industries

Nearest hazardous industries are:

SSAB Europe Steel Mill 3,5 km
AGA Industrial Gases Factory 3,5 km
Elenia Vanaja Power Plant 3 km

Nearest hazardous chemicals storage:

Etra 1 km (the proposed site is outside the consultation zone)

Proximity of near by communities

Miemala housing area 1,5 km
Harviala housing area 2 km

Current access to the site

Two or more roads

Notes on current and planned access to the site

Karanojantie street is already built.

Emergency vehicle accessibility

Emergency vehicles can access the area from two directions: from Karanojantie street and Taipaleentie street.

Distance to nearest international airport / [km]

90

Distance to nearest fire & rescue station / [km]

7

Distance to nearest police station / [km]

7

Distance to nearest hospital or health care center / [km]

8

Availability of public transportation

good

What is needed to realize total power supply?

To realize total power supply a agreement with local energy company (Elenia Oy) must be done.

Lead time for total power supply to the site / [months]

24

Redundancy power availability

Available (same as total main power feed)

Arrangement of redundancy power

Must be arranged with local energy company. Power is availble from two different 110 kV lines.

Distance to 20 kv power connection point / [km]

0.1

Distance to 110 kv power connection point / [km]

3

Distance to redundancy power connection point / [km]

3

Distance to local grid substation, 110 kv / [km]

3.5

Distance to national grid substation, 400 kv / 110 kv / [km]

4

First phase electricity power supply (in 18 months or sooner)

11-20 MW

First phase power supply to the site

0 - 18 months

First phase electrical feed to the site

20 kV

First phase redundancy power availability

Available (same as first phase main power feed)

Notes on power supply

Power supply is provided by Elenia Oy and DC's excess heat can be sold back to Elina Lämpö Oy.


Local green energy

Available

Amount of diverse connections

3 or more

Connectivity supplier(s) to provide diverse connectivity

FNE Finland Oy

Elisa Oyj

DNA Oyj

Arrangement of connection diversity

All the 5 ibre providers backbones go through Hämeenlinna(Helsinki-Tampere backbone)

Dark fiber on the site

Available

Lead time for minimum of two connections / [months]

1

Distances to local internet exchange points (ix) in Finland

75 km

Describe different cable routes from the site to key directions in and from Finland

Direct route to Europe

  • Hämeenlinn– Helsinki buried next to road number 130
  • Helsinki – Rostock via C-Lion1
  • Rostock – Frankfurt via Gas line fiber route
  • RTD estimation 22ms

Route via Sweden to Europe

  • Hämeenlinna – Helsinki buried next to road number 130
  • Helsinki – Rostock via C-Lion1
  • Rostock – Frankfurt via Gas line fiber route
  • RTD estimation 22ms

Routes to Russi

  • Hämeenlinna–Riihimäki- Lahti – Kouvola next to road number 12
  • Kouvola - Lappeenranta next to road number 6
  • RTD estimation to Moscow 12,7 ms

Notes on fiber connectivity

Location is in the middle of the national growth corridor. Connectivity is excellent in Hämeenlinna

Commitment of local utility companies

Ongoing planning and investment readiness exists

Water utilities on site

Waste water sewage available

Notes on water utilities

Pipelines at street near to site, house connections needed. Existing tap water peak capasity 13l/s (in one year 20l/s, max. 5-6h). Available capacity for whole Moreeni area 1000m3/d. Peak flows over 20l/s need water tank.

Waste water peak flows over 20l/s need equalisation tank. For strong waste waters pre-treatment will be required.

District heating network

Available

Distance to district heating network / [km]

0.2

Natural gas availability on site

Natural gas available

Distance to natural gas network / [km]

0.4

Opportunities to utilize waste heat

District heating network in the area provides option for utilizing waste heat.

Distance to delivery point / [km]

0.2

Investment incentives

  • Hämeenlinna supports strongly investments -
  • We help new businesses to establish their operations on the region
  • Search for finance solutions
  • Project management

Notes on local ecosystem

  • City of Hämeenlinna and Linna Development Center Ltd at your service:

  • municipality’s fast decision making -
  • setting up project organisation -
  • flexible plot modification to customers needs -
  • helps in utility connections and permits -
  • existing network to utilize excess heat -
  • city with competitive pricing -
  • help in RFQ, procurement etc.
  • University of Applied Sciences with well-matching educational program

*Contributed employee training courses

Members of the local datacenter campus

City of Hämeenlinna

HAMK University

ST1-Biofuels

Kiertokapula Oy

Elisa Oyj

Availability of skilled laborforce

There´s plenty of skilled labor available, both mechanical and electric expertice.


Higher education resources

Hämeen Ammattikorkeakoulu (HAMK) University of supplied scienses

Person(s) responsible for provided information

Ari Räsänen (director)

ari.rasanen@linnan.fi

+358 408667501

Availability

For sale

Site address

Karanojantie, 13430 Hämeenlinna, Finland