Data centers
Päivärinne Data Center site in Warkaus Green Tech Valley
Päivärinne Data Center site located in Warkaus Green Tech Valley in Varkaus. The local community and stakeholders are committed to work to help and advice Data Center operators who are interested in the DC site offering of Warkaus Green Tech Valley. Päivärinne DC site is in excellent location where power and connectivity are easy and fast to connect. The DC operator can choose from various cooling methods but cooling with cooling towers would be the most effective on this area. There are no natural disasters on the area. In Varkaus there are excellent contractors since they are used to work with big industries. A lot of highly trained workforce are available and they used to work in shifts if needed. The scenery in Varkaus area is amazing with lot of lakes and recreational areas. Local cultural life is vivid and verstile. It is easy to find housing on Varkaus area.
Zoning readiness
Zoning ready for data center useNotes on investment regulatory readiness
Decision makers and local authority of Varkaus supports strongly the process of the new Data Center in Varkaus. Varkaus has established "Warkaus Green Tech Valley" - program which coordinates all actions to make Varkaus and Päivärinne area ready for Data Center investment.
Local authority together with local developing Company Navitas is commited to co-operate and help in getting Data Center on the area.
Building right / [m2]
129 500Site area / [m2]
185 000Easements
No easements
Notes on site size and building permit
Building permit will be easy to achieve since the area is dedicated to Data Center use
Design rules and regulations
EN standard and Finnish national building regulation
Pre-approval of construction and environment permits, fire and rescue plan
Negotiations initiatedSite shape
Site shape is polygonal.
Prevailing wind directions
South
Natural water source available for cooling
AvailableIf yes, distance to water source / [meters]
50Notes on cooling options
Water cooling is possible . Obvious choise is use cooling towers and make-up water from lake nearby.
Direct air cooling and adibatic cooling also viable options.
Type of ground
Finnish bedrock, mostly moraine
Levelling of plot
Plot is not construction ready / levelledType of forestry (if plot not levelled)
The area is open. No trees
Layout plan of datacenter building(s)
Detailed plan existsNatural risks
No natural risks
Proximity of major roads, airports, flight paths and railways
Railroad (Varkaus railwaysation) is 2 km.
Highway is in 3 km distance. It is possible to transport big parts from sea via Saimaa Channel to Varkaus.
Varkaus has airport also in Joroinen (20 km distance). It can be used for private business flights or transports. It has no regular traffic.
The nearest commercial airport is in Kuopio about 90 km and 1h driving distance. It has regular flights 6 times a day to Helsinki international airport.
Proximity of hazardous industries
No hazardous industries nearby
Proximity of near by communities
Varkaus downtown 3 km, City of Pieksämäki 40 km and city of Kuopio 70 km away.
Current access to the site
Two or more roadsNotes on current and planned access to the site
At least two access roads will be built to the site as required by the DC Project.
Emergency vehicle accessibility
Easy road access straight to the fire station and rescue departments.
Distance to nearest international airport / [km]
315Distance to nearest fire & rescue station / [km]
3Distance to nearest police station / [km]
3Distance to nearest hospital or health care center / [km]
2Availability of public transportation
No public transportation to the site but can be arranged
What is needed to realize total power supply?
New 110 kV cable (about 400m) and 110/20 kV transformers, 20 kV switchgears
Lead time for total power supply to the site / [months]
24Redundancy power availability
Available (same as total main power feed)Arrangement of redundancy power
There should be double feed cables
Distance to 10 kv power connection point / [km]
0.4Distance to 110 kv power connection point / [km]
0.4Distance to redundancy power connection point / [km]
0.4Distance to national grid substation, 400 kv / 110 kv / [km]
0.4First phase electricity power supply (in 18 months or sooner)
7-10 MWFirst phase power supply to the site
0 - 18 monthsFirst phase electrical feed to the site
10 kVFirst phase redundancy power availability
Available (same as first phase main power feed)Notes on power supply
Power supply is easy to organize. Local power Company Savonvoima Oy can provide connection to existing 10 kV grid and also their 110 kV grid.
However Fingrid (National Grid) has powerfull 110 kV substation only 400m distance so 110 kV connection is really fast to organize. Existing path ways for 110 kV overhead lines go beside the Päivärinne DC site so no long time permit period is needed.
Local green energy
AvailableDetails on local green energy (suppliers)
Local energy company Savonvoima owns bio-, wind and hydro energy plants or has partial ownerships to them.
Local electricity supplier(s)
Savon Voima Oyj
Distance to optical fiber infrastructure / [km]
0.3Distance to optical fiber infrastructure / [miles]
0.186411Amount of diverse connections
3 or moreConnectivity supplier(s) to provide diverse connectivity
Fingrid Oyj
Arrangement of connection diversity
- Varkaus DC Päivärinne is in well positioned site from network connectivity perspective and building the infrastructure should be relatively easy
- Varkaus DC area has 3 diverse routes to the area:
- two by Fingrid OPGW
- one by Telia terrestrial cable
- one via VT5
- DNA and Elisa fiber infrastructures are not that close so additional investments would be required to get their networks connected to Päivärinne
- There are no network core PoPs close to Varkaus DC so the operators would need to invest to DWDM and MPLS equipment at the site
- During discussions with the operators they indicated their willingness to invest in the fiber and equipment infra to the planned DC area
Dark fiber on the site
AvailableLead time for minimum of two connections / [months]
3Distances to local internet exchange points (ix) in Finland
FICIX2 316 km Helsinki, FICIX1 335 km Espoo and FICIX3 360 km OuluDescribe different cable routes from the site to key directions in and from Finland
Fiber routes to Stockholm, Helsinki and Frankfurt
Route 1:
Varkaus DC – Mikkeli (OPGW 85km) – Kouvola along railroad 5 (115km) – Helsinki along the VT6 and 170 (150km) – Rostock via C-Lion1 (1173km) – Frankfurt (865km)
- ~2300km
Route 2:
- Varkaus DC – Varkaus new local tail 5km – Pieksämäki along road 23 – Tampere(242km) – Turku along railway (170km) – Stockholm SK1 along the road (272km)
- ~690km
Route 3:
- Varkaus DC – Kuopio(OPGW 66km) – Pieksämäki (85km) – Mikkeli (72km) – Kouvola (106 km) – Lahti (62km) – Kerava (103km) – Helsinki (25km) Next to railroad – Tallinn – Riga – Vilnius – Warsaw – Frankfurt (2400km)
- ~2840 km
Fiber routes to Finnish Russian border
Route 1:
- Varkaus DC – Mikkeli – Lappeenranta OPGW – Vainikkala VT390
- 215 km
Route 2:
- Varkaus DC – Joensuu (VT23) – Parikkala (along the railway) – Imatrankoski (along the railway)
- 330 km
Route 3:
- Varkaus DC – Mikkeli (VT5) – Kouvola – Kotka – Kingisepp
- 400 km
Notes on fiber connectivity
Fiber connectivity is easy to organize. Operators are willing to arrange more connections if required
Commitment of local utility companies
Ongoing planning and investment readiness existsWater utilities on site
Storm water drainage availableNotes on water utilities
Utilities locate very near from where they are easy to connect
District heating network
AvailableDistance to district heating network / [km]
0.6Notes on district heating network
Local district heating Company is Varkauden Aluelämpö Oy
Natural gas availability on site
Not availableOpportunities to utilize waste heat
Local district heating Company can use excess heat
Distance to delivery point / [km]
0.6Notes on local ecosystem
Big machinery companies like Foster Wheeler and Andritz and Pulp and Paper mill Stora Enso Varkaus are located in town. There fore a lot of service and maintenance companies are located in Varkaus area. These companies can serve also Data Center companies.
Local workforce are used to heavy and big projects and also work as in 3-shifts if required.
Availability of skilled laborforce
Skilled labor force are weel available due to local industries and service sector.
Varkaus and Kuopio have various selection of Universities of Applied Sciences and University in Kuopio.
Higher education resources
Closest university is in Kuopio with physics, science and computing programs and classes.
Person(s) responsible for provided information
Osmo Kokkonen (Project Manager)
osmo.kokkonen@navitas.fi
+ 358405588108
Reijo Parkkinen (Project Manager)
reijo.parkkinen@fimpec.fi
Person(s) provided this information
Osmo Kokkonen (Project Manager)
osmo.kokkonen@navitas.fi
+ 358405588108
Reijo Parkkinen (Project Manager)
reijo.parkkinen@fimpec.fi