Data centers
Tuusula - Hetzner Datacenter Park Helsinki
With the construction of the first data center park in Finland, Hetzner Group has set a precedent for other data center operators to establish operations in Tusuula for mutually-beneficial competitive advantage. The site is ready to build and Hetzner Finland Oy has already started to build its data centers.
A proven and innovative infrastructural concept is being used on site, which takes into account the most critical factors needed for the successful operation of a data center such as fast connections and maximum stability. Moreover, this unique design allows for the layout of critical supply lines on site and for easily accessible maintenance tunnels between separate sections of the building to optimize networking between the various data centers.
This new concept makes it possible for data center units to be built and connected to the existing power and data networks in a very short space of time. Redundant connections to the adjacent power station guarantee power input and multiple fibre optic connections to Helsinki and Germany ensure the rapid exchange of data.
Aside from the infrastructural aspects, the site also offers economic advantage in terms of synergy and economies of scale by concentrating several data centers in one area. Potential savings to be made on data center operations include, for example, power supply, air cooling, staff and building security costs.
The most important benefits for this innovative type of infrastructure in Tuusula are summarized below:
- Optimal power availability owing to redundant connections to the power station on site
- Multiple high-speed fibre optic connections to Helsinki, Sweden and Germany
- Direct connection to the C-Lion cable between Finland and Germany
- Redundant layout of critical supply lines
- Easily accessible maintenance tunnels to optimize networking between the various data center units
- Cost-effective establishment of air cooling and emergency power facilities
- Over 150,000 square metres of buildable space
- New data centers can be built in a very short space of time
- Potential savings in terms of data center operating costs
- Perfect transport connection and very close proximity to Helsinki
Why not take a look at the many possibilities Datacenter Park Helsinki has to offer. If you are interested to use our infrastructure or to build one of your DCs at our Park please contact us.
Zoning readiness
Zoning ready for data center useNotes on investment regulatory readiness
Site is ready for construction in three (3) months from the investment decision.
Building right / [m2]
30 000Site area / [m2]
150 000Easements
No easements on the site
Design rules and regulations
National and EU standard rules and regulations
Pre-approval of construction and environment permits, fire and rescue plan
Plans pre-approved by all authoritiesSite shape
the total site has a rectangular shape,
but for a 3rd party DC operator another shape would be also possible inside that area
Notes on site topography
The site is very flat and levelled. Ground survey is available. Piling would be necessary to stabilize the ground
Natural water source available for cooling
Not availableNotes on cooling options
Free air cooling available
Natural risks
No natural risks
Proximity of major roads, airports, flight paths and railways
Future Ringroad 4: directly near the site
Highway E75 Helsinki-Lathi: 5km - 8min
Vanta Airport: 8km - 10min
Helsinki Center: 22km - 30min
Proximity of hazardous industries
No hazardous industries in this area.
Proximity of near by communities
The site is located in an industrial and logisitic used area with perfect transport connection.
The next settlement and redidential areas are approximately 1km away behind the forest.
Current access to the site
One roadNotes on current and planned access to the site
Access to the site by a local roud. The rouds inside the site will be designed to the needs of the DC operators
Emergency vehicle accessibility
Fully accessible
Distance to nearest international airport / [km]
8Distance to nearest fire & rescue station / [km]
8Distance to nearest police station / [km]
7Distance to nearest hospital or health care center / [km]
5Availability of public transportation
Bus stops within walking distance
Distance to korson asema station: 3 km with trains lines K,N,T between Kerava and Helsinki
Distance to Lejle station: 3km with train lines I,P from the airport to city center Helsinki
What is needed to realize total power supply?
At the moment a own substation is getting build on the site with 2x20 MW transformers. But the substation could be extended if needed
Lead time for total power supply to the site / [months]
12Redundancy power availability
Available (same as total main power feed)Arrangement of redundancy power
The substation has 2 redundant transformers
The substation is feeded from two independent directions
Distance to 110 kv power connection point / [km]
0.1Distance to redundancy power connection point / [km]
0.1Distance to national grid substation, 400 kv / 110 kv / [km]
5.5First phase electricity power supply (in 18 months or sooner)
11-20 MWFirst phase power supply to the site
0 - 18 monthsFirst phase electrical feed to the site
110 kVFirst phase redundancy power availability
Available (same as first phase main power feed)Notes on power supply
The electricity grid (110kV) from Caruna is directly clos to the site.
The construction of the substation on site with 2x20MW transformers has already started, so that the total power supply to the site will be available in spring/summer 2018.
Local green energy
AvailableLocal electricity supplier(s)
Caruna Oy
Amount of diverse connections
3 or moreConnectivity supplier(s) to provide diverse connectivity
Elisa Oyj
Arrangement of connection diversity
Due to the fact, that Hetzer will run his own DCs on that site, several carriers and fibre providers are already on site, with different routes.
There is also a direct connection from this site to to the seacable C-LION to Germany available.
Dark fiber on the site
AvailableDistances to local internet exchange points (ix) in Finland
20Describe different cable routes from the site to key directions in and from Finland
1. Route: Datacenterpark to landingstation C-Lion to Germany
2. Route: Datacenterpark to west coast of Finland to Sweden
3. Route: Datacenterpark to Ficix 2
Notes on fiber connectivity
There are 2 indipendent connection points to the site
Commitment of local utility companies
Ongoing planning and investment readiness existsWater utilities on site
Potable water supply availableDistrict heating network
AvailableDistance to district heating network / [km]
0.1Natural gas availability on site
Not availableDistance to natural gas network / [km]
0.1Opportunities to utilize waste heat
There are option to utilize waste heat and to provide the heat to the local heating network
Investment incentives
None
Availability of skilled laborforce
Due to the fact that the site is located in the greater reagion of Helsinki and very close to the greater residentail areas of Vantaa, a lot of skilled laborforces are available
Higher education resources
All Helsinki education resources are very good avaiable for that site
Person(s) responsible for provided information
Daniel Biller (Business development)
daniel.biller@hetzner.de
+49 9831 505 133
Person(s) provided this information
Daniel Biller (Business development)
daniel.biller@hetzner.de
+49 9831 505 133