Data centers
Ahvenkoski DC Site, Pyhtää (reserved until 09/2024)
- Direct link Ahvenkoski | Business Kotka-Hamina (businesskotkahamina.fi)
- Kotka - Hamina region has a strong experience with Data Centers - Google is already here.
- Strong local experience and excellent network of companies in Data Center business
- The strongest possible energy grid
- The best connections to both West and East
- Continuous development with Universities and other Educational institutes
- Strong local commitment – with cities and other authorities
- Zoned DC Site - ready for construction within 3-4 months (building permit processing).
- Ahvenkoski is next to the national Grid (Finngrid) - both 110 kW and 400 kW lines go next to the site. Direct access to Fingrid is a huge advantage (no local electricity company + extra fees)
- New Electricity Substation planned and zoned next to the site
- Exceptionally good connectivity - all major Telco providers have their main fiber lines going next to the site
- Green power (hydro + wind + solar) available in close range
- Easy and fast access to and from Helsinki area - within less than an hour.
Zoning readiness
Zoning ready for data center useNotes on investment regulatory readiness
Zoning is ready, the plot is ready for construction within 3-4 months. Needs the building permit and during the quick processing time the forestry work and plot leveling can be done.
Building right / [m2]
50 000Site area / [m2]
104 000Easements
NONE
Notes on site size and building permit
Building permit processing can be done very quickly by municipality of Pyhtää.
Pre-approval of construction and environment permits, fire and rescue plan
Plans pre-approved by all authoritiesSite shape
Almost rectangular
Notes on site topography
Forest, rock and moraine ground, ready for construction in about 3 months.
Prevailing wind directions
Prevailing wind is South-Southwest. Detailed studies of wind description exists (2016). Also wind information for several years can be provided in very short notice.
2016:
South: 10,6 % (av. speed 3,2 m/s)
South-Southwest: 10,5 % (av 3,4 m/s)
Southwest: 5,9 % (av 3,6 m/s)
Natural water source available for cooling
AvailableIf yes, distance to water source / [meters]
400Notes on cooling options
Direct air cooling:
Ambient air conditions favor direct air cooling. With adiabatic cooling white space temperature does not exceed 25 °C
Cooling towers:
High stability due to low ambient wet bulb temperature. Makeup water available from the river
River water cooling:
Very high stability and efficiency. Cost-effective especially in larger scale.
Energy re-use:
Different excess heat users available. Excess heat can be used “as is” or as “upgraded” into higher temperature.
Type of ground
Forest, rock and moraine ground, ready for construction in about 3 months.
Levelling of plot
Plot is not construction ready / levelledType of forestry (if plot not levelled)
Mostly pine. The plot leveling can be negotiated with the owner; Municipality of Pyhtää.
Layout plan of datacenter building(s)
Preliminary plan exitsNatural risks
None
Proximity of major roads, airports, flight paths and railways
- Nearest highway: 500 m,
- Nearest community center: Municipality of Pyhtää 6 km
- Major international airport: Helsinki airport 98 kilometers, less than 1 hour by car
Connections: bus stops (to Helsinki and Kotka) 800 m, international harbor, train stations in Kotka (30 km),
Proximity of hazardous industries
None
Proximity of near by communities
Pyhtää - 6 km / 15 km
Kotka - 30 km
Helsinki - 98 km
Current access to the site
Two or more roadsNotes on current and planned access to the site
Two different routes to the site. Pyhtää rescue department in 4 / 15 km. Pyhtää Healthcare Center 16 km. Kotka Central Hospital 30 km. Kotka Central Police Station 30 km.
Emergency vehicle accessibility
2 separate routes to the site.
Distance to nearest international airport / [km]
98Distance to nearest fire & rescue station / [km]
4Distance to nearest police station / [km]
30Distance to nearest hospital or health care center / [km]
30Availability of public transportation
Busses to Pyhtää, Kotka, Helsinki go by the site, the closest bus stop next to the site.
What is needed to realize total power supply?
Utilizing existing substation or building the new substation (planned and permitted) by Fingrid.
Lead time for total power supply to the site / [months]
3Redundancy power availability
Available (same as total main power feed)Arrangement of redundancy power
Two way connection directly from Fingrid available to the Site.
Distance to 10 kv power connection point / [km]
0.5Distance to 20 kv power connection point / [km]
0.5Distance to 110 kv power connection point / [km]
0.5Distance to redundancy power connection point / [km]
0.5Distance to local grid substation, 110 kv / [km]
0.5Distance to national grid substation, 400 kv / 110 kv / [km]
0.5First phase electricity power supply (in 18 months or sooner)
11-20 MWFirst phase power supply to the site
0 - 18 monthsFirst phase electrical feed to the site
20 kVFirst phase redundancy power availability
Available (same as first phase main power feed)Notes on power supply
Next to the hydropower station (30 MW), Additional hydropower (5-7 MW) in close range, wind power up to 50 MW also available in the area.
When the decision of new DC is made, Fingrid has planned to build a new substation next to DC Site. There is a possibility to build a redundant solution from Fingrid (the main lines both 400 kW and 110 kW next to the site - redundant from both directions).
Local green energy
AvailableDetails on local green energy (suppliers)
All Nordpool (common Nordic energy market) green power available.
2 Hydro Power plants in close range.
Solar Power Plant in close range. Wind Power Mills in close range.
Local electricity supplier(s)
Fingrid Oyj
Kymenlaakson Sähkö Oy
Distance to optical fiber infrastructure / [km]
0.5Distance to optical fiber infrastructure / [miles]
0.310685Amount of diverse connections
3 or moreConnectivity supplier(s) to provide diverse connectivity
Elisa Oyj
DNA Oyj
Arrangement of connection diversity
All operators have their main fibers going in very close range to both West (Helsinki hub - to Sweden, Germany, Central Europe) and East (Russia, Asia). Four different fiber routes to capital area of Finland, 3 different routes to Central Europe. Dark fiber available.
Dark fiber on the site
AvailableLead time for minimum of two connections / [months]
3Distances to local internet exchange points (ix) in Finland
95Describe different cable routes from the site to key directions in and from Finland
3 diverse routes to Helsinki by land and 1 by sea (from Mussalo port, Kotka). Additional sea route available by end of 2017.
Commitment of local utility companies
Ongoing planning and investment readiness existsWater utilities on site
Potable water supply availableDistrict heating network
Not availableNatural gas availability on site
Not availableDistance to natural gas network / [km]
20Opportunities to utilize waste heat
Several possibilities (heating, greenhouses, etc.) already planned. Needs to be planned in detail depending on cooling solution of DC.
Investment incentives
Investment support available by the local, district and national funds. (ELY, TEKES, etc.)
Notes on local ecosystem
Existing strong ecosystem including all needed phases and areas in DC operations already available. Local experience in DC operations very strong. Strong commitment also from local community, authorities electricity companies and development agency.
Availability of skilled laborforce
Already existing skilled workforce in the area. Additionally close to both Helsinki area and to Lappeenranta (Lappeenranta University of Technology)
Local community college also has courses for DC operations in blue collar level.
Higher education resources
Aalto Unviersity
Lappeenranta University of Technology
XAMK (University of Applied Sciences of Sout-East Finland)
Person(s) responsible for provided information
Janne Korkeamäki (FDI Executive)
janne.korkeamaki@cursor.fi
Person(s) provided this information
Janne Korkeamäki (FDI Executive)
janne.korkeamaki@cursor.fi