Data centers Ahvenkoski DC Site, Pyhtää (reserved until 09/2024)

Data centers

Ahvenkoski DC Site, Pyhtää (reserved until 09/2024)

  • Direct link Ahvenkoski | Business Kotka-Hamina (businesskotkahamina.fi)
  • Kotka - Hamina region has a strong experience with Data Centers - Google is already here.
  • Strong local experience and excellent network of companies in Data Center business
  • The strongest possible energy grid
  • The best connections to both West and East
  • Continuous development with Universities and other Educational institutes
  • Strong local commitment – with cities and other authorities

 

  • Zoned DC Site - ready for construction within 3-4 months (building permit processing).
  • Ahvenkoski is next to the national Grid (Finngrid) - both 110 kW and 400 kW lines go next to the site. Direct access to Fingrid is a huge advantage (no local electricity company + extra fees)
  • New Electricity Substation planned and zoned next to the site
  • Exceptionally good connectivity - all major Telco providers have their main fiber lines going next to the site
  • Green power (hydro + wind + solar) available in close range
  • Easy and fast access to and from Helsinki area - within less than an hour.
Address: Voimalantie, 07960 Pyhtää, Finland
Coordinates: 60.49367212,26.46010392
Owned by: Cursor Oy
Type: Greenfield

Zoning readiness

Zoning ready for data center use

Notes on investment regulatory readiness

Zoning is ready, the plot is ready for construction within 3-4 months. Needs the building permit and during the quick processing time the forestry work and plot leveling can be done.

Building right / [m2]

50 000

Site area / [m2]

104 000

Easements

NONE

Notes on site size and building permit

Building permit processing can be done very quickly by municipality of Pyhtää.

Pre-approval of construction and environment permits, fire and rescue plan

Plans pre-approved by all authorities

Site shape

Almost rectangular

Notes on site topography

Forest, rock and moraine ground, ready for construction in about 3 months.

Prevailing wind directions

Prevailing wind is South-Southwest. Detailed studies of wind description exists (2016). Also wind information for several years can be provided in very short notice.

2016:

South: 10,6 % (av. speed 3,2 m/s)

South-Southwest: 10,5 % (av 3,4 m/s)

Southwest: 5,9 % (av 3,6 m/s)

Natural water source available for cooling

Available

If yes, distance to water source / [meters]

400

Notes on cooling options

Direct air cooling:

Ambient air conditions favor direct air cooling. With adiabatic cooling white space temperature does not exceed 25 °C

Cooling towers:

High stability due to low ambient wet bulb temperature. Makeup water available from the river

River water cooling:

Very high stability and efficiency. Cost-effective especially in larger scale.

Energy re-use:

Different excess heat users available. Excess heat can be used “as is” or as “upgraded” into higher temperature.

Type of ground

Forest, rock and moraine ground, ready for construction in about 3 months.

Levelling of plot

Plot is not construction ready / levelled

Type of forestry (if plot not levelled)

Mostly pine. The plot leveling can be negotiated with the owner; Municipality of Pyhtää.

Layout plan of datacenter building(s)

Preliminary plan exits

Natural risks

None

Proximity of major roads, airports, flight paths and railways

  • Nearest highway: 500 m,
  • Nearest community center: Municipality of Pyhtää 6 km
  • Major international airport: Helsinki airport 98 kilometers, less than 1 hour by car

Connections: bus stops (to Helsinki and Kotka) 800 m, international harbor, train stations in Kotka (30 km),

Proximity of hazardous industries

None

Proximity of near by communities

Pyhtää - 6 km / 15 km

Kotka - 30 km

Helsinki - 98 km

Current access to the site

Two or more roads

Notes on current and planned access to the site

Two different routes to the site. Pyhtää rescue department in 4 / 15 km. Pyhtää Healthcare Center 16 km. Kotka Central Hospital 30 km. Kotka Central Police Station 30 km.

Emergency vehicle accessibility

2 separate routes to the site.

Distance to nearest international airport / [km]

98

Distance to nearest fire & rescue station / [km]

4

Distance to nearest police station / [km]

30

Distance to nearest hospital or health care center / [km]

30

Availability of public transportation

Busses to Pyhtää, Kotka, Helsinki go by the site, the closest bus stop next to the site.

What is needed to realize total power supply?

Utilizing existing substation or building the new substation (planned and permitted) by Fingrid.

Lead time for total power supply to the site / [months]

3

Redundancy power availability

Available (same as total main power feed)

Arrangement of redundancy power

Two way connection directly from Fingrid available to the Site.

Distance to 10 kv power connection point / [km]

0.5

Distance to 20 kv power connection point / [km]

0.5

Distance to 110 kv power connection point / [km]

0.5

Distance to redundancy power connection point / [km]

0.5

Distance to local grid substation, 110 kv / [km]

0.5

Distance to national grid substation, 400 kv / 110 kv / [km]

0.5

First phase electricity power supply (in 18 months or sooner)

11-20 MW

First phase power supply to the site

0 - 18 months

First phase electrical feed to the site

20 kV

First phase redundancy power availability

Available (same as first phase main power feed)

Notes on power supply

Next to the hydropower station (30 MW), Additional hydropower (5-7 MW) in close range, wind power up to 50 MW also available in the area.

When the decision of new DC is made, Fingrid has planned to build a new substation next to DC Site. There is a possibility to build a redundant solution from Fingrid (the main lines both 400 kW and 110 kW next to the site - redundant from both directions).

Local green energy

Available

Details on local green energy (suppliers)

All Nordpool (common Nordic energy market) green power available.

2 Hydro Power plants in close range.

Solar Power Plant in close range. Wind Power Mills in close range.

Local electricity supplier(s)

Fingrid Oyj

Kymenlaakson Sähkö Oy

Distance to optical fiber infrastructure / [km]

0.5

Distance to optical fiber infrastructure / [miles]

0.310685

Amount of diverse connections

3 or more

Connectivity supplier(s) to provide diverse connectivity

Elisa Oyj

DNA Oyj

Arrangement of connection diversity

All operators have their main fibers going in very close range to both West (Helsinki hub - to Sweden, Germany, Central Europe) and East (Russia, Asia). Four different fiber routes to capital area of Finland, 3 different routes to Central Europe. Dark fiber available.

Dark fiber on the site

Available

Lead time for minimum of two connections / [months]

3

Distances to local internet exchange points (ix) in Finland

95

Describe different cable routes from the site to key directions in and from Finland

3 diverse routes to Helsinki by land and 1 by sea (from Mussalo port, Kotka). Additional sea route available by end of 2017.

Commitment of local utility companies

Ongoing planning and investment readiness exists

Water utilities on site

Potable water supply available

District heating network

Not available

Natural gas availability on site

Not available

Distance to natural gas network / [km]

20

Opportunities to utilize waste heat

Several possibilities (heating, greenhouses, etc.) already planned. Needs to be planned in detail depending on cooling solution of DC.

Investment incentives

Investment support available by the local, district and national funds. (ELY, TEKES, etc.)

Notes on local ecosystem

Existing strong ecosystem including all needed phases and areas in DC operations already available. Local experience in DC operations very strong. Strong commitment also from local community, authorities electricity companies and development agency.

Availability of skilled laborforce

Already existing skilled workforce in the area. Additionally close to both Helsinki area and to Lappeenranta (Lappeenranta University of Technology)

Local community college also has courses for DC operations in blue collar level.

Higher education resources

Aalto Unviersity

Lappeenranta University of Technology

XAMK (University of Applied Sciences of Sout-East Finland)

Person(s) responsible for provided information

Janne Korkeamäki (FDI Executive)

janne.korkeamaki@cursor.fi

Person(s) provided this information

Janne Korkeamäki (FDI Executive)

janne.korkeamaki@cursor.fi

Availability

For sale

Site address

Voimalantie, 07960 Pyhtää, Finland