Home of Data, Oulu – Rusko Site
Oulu welcomes new data center investors and operators to the Capital of Northern Scandinavia! We offer ´one stop shop´ service to help, support and advice your unique data center kick-off from investment phase to ramp-up. We have a strong community support for data centers: all the preliminary plans have been accepted by the key authorities and we have an investment grant package to offer. Our approachable project staff is ready and eager to help you!
Oulu is one of the leading centers of wireless technology in the world, a startup generator and a university town, with skilled and dedicated workforce and an effective supplier ecosystem ready to serve the forthcoming data centers.
Power grid in the Oulu region has been built to support mission critical industries e.g. paper mills, and provides renewable hydropower that can scale up to any data center demand. Our local power supplier Oulun Energia provides smart energy services and reliable green power to companies at a competitive price and is a key partner in Home of Data -project.
Zoning readiness
Zoning ready for data center useNotes on investment regulatory readiness
Rusko site is a large industrial district within Oulu with no need for special permit process for datacenters
Building right / [m2]
200 000Site area / [m2]
670 000Site area can be extended up to / [m2]
1 000 000Notes on site size and building permit
Site size is expandable
Pre-approval of construction and environment permits, fire and rescue plan
Plans pre-approved by all authoritiesSite shape
Flat
Notes on site topography
Performed analysis on the Rusko area suitability for large datacenter site construction based on the customer’s high level requirements is done. Area is flat. Soil investigations have been performed on most of the area and area is sand/moraine well suitable for construction. For some parts of the area, some soil replacement is needed and more detail information is available.
Prevailing wind directions
Prevailing wind direction south east
Natural water source available for cooling
AvailableIf yes, distance to water source / [meters]
500Notes on cooling options
Plans ready for connecting the site to the river Oulu, with up to 10 m³/sec available source for cooling water
Type of ground
Moraine and silty sand / silty clay
Levelling of plot
Plot is partly construction ready / levelledLayout plan of datacenter building(s)
Preliminary plan exitsNatural risks
No major hazards. The bedrock in Finland is stable, and the possibility for any large-scale movements inside the bedrock is minimal. Risk of forest fires in the region is investigated as well as Rusko area flood risks.
Current access to the site
Two or more roadsEmergency vehicle accessibility
Access is available.
Distance to nearest international airport / [km]
22Distance to nearest fire & rescue station / [km]
2Distance to nearest police station / [km]
8Distance to nearest hospital or health care center / [km]
1What is needed to realize total power supply?
1,4km 110kV line from Leväsuo power station. 110kV/10kV or 110kV/20kV power station to be built to the site. Preliminary design is available.
Lead time for total power supply to the site / [months]
12Redundancy power availability
Available (same as total main power feed)Arrangement of redundancy power
Similar electricity supply will be built as a main power feed.
Distance to 10 kv power connection point / [km]
1.4Distance to 110 kv power connection point / [km]
1Distance to redundancy power connection point / [km]
1Distance to local grid substation, 110 kv / [km]
1Distance to national grid substation, 400 kv / 110 kv / [km]
1First phase electricity power supply (in 18 months or sooner)
11-20 MWFirst phase power supply to the site
0 - 18 monthsFirst phase electrical feed to the site
20 kVFirst phase redundancy power availability
Available (same as first phase main power feed)Notes on power supply
500+ MW of hydro power available from the power plants in river Oulu. Oulun Energia hydroelectric generation capacity is 75 MW, and electricity production capacity is approximately 340 GWh in average flow conditions.
10+ MW of wind power readily available within Oulu region.
Schedule from order to full capacity 12 months.
Local green energy
AvailableDetails on local green energy (suppliers)
Oulun Energia,
The group operates across the entire value chain of the energy sector:
- Production of raw materials
- Generation of heat and electricity
- Power sales and distribution
- Services including smart energy services, network management, subcontracting and maintenance
Distance to optical fiber infrastructure / [km]
1Distance to optical fiber infrastructure / [miles]
0.62137Amount of diverse connections
3 or moreConnectivity supplier(s) to provide diverse connectivity
Elisa Oyj
DNA Oyj
Dark fiber on the site
AvailableLead time for minimum of two connections / [months]
3Distances to local internet exchange points (ix) in Finland
Finnish internet exchange, FICIX3 hub located 8 km from the site, in Oulu city centerDescribe different cable routes from the site to key directions in and from Finland
Three different route options to the site available. Lead time fir al of them three months. FICIX3 located at City of Oulu, distance to the site about 8km.
Notes on fiber connectivity
Dark fiber available from selected operators.
Commitment of local utility companies
Ongoing planning and investment readiness existsWater utilities on site
Potable water supply availableDistrict heating network
AvailableDistance to district heating network / [km]
1Natural gas availability on site
Not availableNotes on (liquid) natural gas
Tornio LNG terminal will be opened 2018. LNG delivery possible when terminal ready.
Opportunities to utilize waste heat
District heat produced by Oulun Energia heats approximately 75 % of homes in Oulu. District heating system is Key Flag certified.
- The district heat network covers downtown of Oulu and the districts of Haukipudas, Oulunsalo and Kiiminki.
- The network of approximately 9,600 customers provides heating for almost 148,000 individuals.
- Oulun Energia also supplies wholesale district heat to the nearby town of Kempele.
- In 2014, the network was extended by approximately 21 km.
- District heat since 1969.
Distance to delivery point / [km]
1Notes on local ecosystem
Oulu has strong R&D ecosystem is the solution to all-round of business needs including consruction and operation.
The industries are the most prominent private employers in the Oulu region, companies in the industry employ 12,500 people, creating strong business and actors.
- Collusion technology/customers, (including reverse pitching)
- New participant Social and health sector ja financing ICT
- 5G, Big data and industrial Internet to support other ecosystems
Availability of skilled laborforce
Oulu is an university town with two technical universities, hosting world leading high-tech companies e.g. Nokia, Mediatek, TI & ABB among others. All this provides not only vast amount of available skilled IT workforce, but also the supplier ecosystem ready for supporting the datacenters in the region
Person(s) responsible for provided information
Tommi Kiviniemi (Project Manager)
tommi.kiviniemi@oulunenergia.fi
+358 50 48 55652